Mustang STY 1A Data Center

PROJECT DETAILS

  • Mustang STY 1A Data Center
  • Holder Construction Group, LLC.
  • 4,200
  • 300,000

This was a LEED project consisting of two tall data floors of heavy structural steel with heavy wall pipe braced framed. The floor load required the W30 main carrying beams to have double angle through and through connections that can be very challenging. We also installed the misc. steel package for stairs, elevators, precast panels, doors, pipe supports and bollards.