This was a LEED project consisting of nine buildings plus a pipe bridge. All of the buildings’ exteriors consisted of precast panels that supported the structural roof system. The main processing building consisted of two types of construction: heavy structural steel with long trusses and long span bar joist as well as typical bar joist and girders. One building has a clear span overhead crane that runs full length of the building.